Saturday, October 10, 2009

Completed foundation

The foundation walls have all been poured now. I enjoy the clean, geometric look of the foundation footers:


From Completed foundation

Next up is installing the interior drainage and backfilling the soil we dug out to get to a load-bearing level, and then we start framing!

Sunday, October 4, 2009

Foundation construction

The foundation is now under construction. The footer has been poured, and the foundation walls are starting to go up. It's exciting, because we can finally start to see the size and shape of the house itself:

This picture and the next one are from when the footer was still being framed. Brie and Kael are standing in one of the kid's bedrooms. The open space on the left with the plywood stacked in the middle is the basement rec room, with the kitchen in about the same place one floor up. The garage is in the upper right.

It looks like the rec room view might not be as bad as I worried in the last post, but it's still not great. Here's Brie and Kael standing where the basement patio will be:

The camera is inside the rec room, and the framing in front of them corresponds to the rec room wall, which will have the room's only window. The floor level will be a couple feet up, so that wall won't be quite as imposing. There will be a roof overhead, though (extending out to the framing behind them), so it's going to be a pretty enclosed, dark space. We'll probably grow some ivy or something to make the wall a little more attractive (masonry is also an option, but probably not worth the cost). The basement is mainly for the kids anyway, and hopefully they won't mind. The basement bedrooms both have windows on the downhill side (with no wall in the side), so they should be OK. The good news is we're saving quite a bit of money by not installing the rockeries that would have made this view more attractive: so much in fact that we're coming out about even, despite all the extra cost of dealing with the soil problems.

We considered not backfilling the space between the retaining wall and the uphill wall of the house, as seen here:

The unfilled space would have been behind the plywood framing, which marks the future foundation wall; the area in the foreground is the patio, which wouldn't have been filled in any event. We thought we could have saved money that way by not doing the backfilling, and building that back wall as an exterior wall rather than a foundation wall, but it turns out that would have required redoing the structural engineering, and it would have cost as much to truck out and dump the excess soil as it would cost to fill in that space, so we're sticking with the original plan.

Saturday, October 3, 2009

Kael walks

In non-house-related news, Kael is walking:


His first birthday was last week. Here's him with his favorite present:


He's getting on toward being officially a toddler!

Friday, September 25, 2009

The new plan

We recently got a vivid demonstration of the unsoundness of the soil on our property:



The geotech engineer said we had to make a series of changes. Especially disappointing was the loss of a lovely maple that would have stood right next of the house. You can see the change in this side-by-side comparison (the maple is just to the left of the dirt pile:


From Foundation digging

From The Wall


The main changes. though, were that we had to put up a big concrete retaining wall on the uphill sides of the house, and we had to dig out the bad soil, which meant going well below the intended ground level for the house in some places:


From The Wall


This involved major changes to the ground plan for the South side of the house (the left of the above picture). We had been planning a set of rockeries to pull the ground away from the basement on that side, where there will be a door and a rec room window, but that's not going to be possible now. Instead, this may be the view out the rec room window:


From The Wall


ETA: Sorry for the broken links; they've now been fixed.

Saturday, September 19, 2009

Underground surprises

We've hit our first real setback (since starting construction): the digging has uncovered a lot more clay in the soil than we expected.


From Foundation digging


It's pretty cool to look at, but from a more practical standpoint it's a problem, because clay expands when wet, and is much softer and less supportive than sand, which is what we thought we had. Compounding the problem, there's a lot of water seeping out of the walls of the dig.


From Foundation digging


Consequently, we couldn't start the foundation this week, and have had to put everything on hold while we try to get a geotechnical engineer out to see if we need to change our plans for the foundation. We have one scheduled to take a look on Monday, so we'll see what he says.

In other news, we've lost two more trees- the hemlock previously referenced, and a large alder. That should be the end of the tree-clearing, unless the maple at the garage corner winds up obstructing the driveway. We'd really like to keep that one, though. Alders are basically weeds, but maples are harder to replace, and this one adds a lot to the forested feel of the front part of the house.

Friday, September 11, 2009

Bug or Feature?


From House footprint


We discovered this at the land earlier this week. This used to be a dead tree trunk leaning against some nearby trees, but the top was chopped off during the clearing (just below the bottom of the frame of this picture), and now it's a perfect log bridge across a 15-foot-deep crevasse maybe 20 feet from the back door of the house. On the one hand, now we have a handy bridge to explore the rest of the property, but on the other hand, we'll have a little kid running loose on this land within a few years, and I can't help thinking of Bridge to Terabithia. We're talking about doing something like run a rope above the log as a handrail, but this could just make it that much more attractive.

In other news, the house footprint has been flagged, and digging has started on the foundation, but it looks like we're losing one more tree (a small Hemlock). There are more pictures at the link above.

Wednesday, September 9, 2009

First Day

We visited the site again yesterday, after the first day of construction. Already the site is transformed- the driveway has been cleared, and partially filled with rocks (and golf balls), and the footprint of the house has been cleared around the edges, though the trees in the middle aren't down yet. There's a huge pile of debris where our driveway apron will be.

First day

We're told the foundation should be dug out by the end of the week.